TEMU ILMIAH IPLBI

Soepardi Harris1, Bambang Perkasa Alam2, Arief Nugroho Wibowo

1,2,3 Program Studi Arsitektur Universitas Indraprasta PGRI.

Email korespondensi: soepardiharris@yahoo.co.id

https://doi.org/10.32315/ti.6.c043

Abstrak

The delay in a construction project depends on the productivity of many things, among others: 1). Human resource issues, 2) unsuitable work methodology, 3) finances, 4) technological limitations, 5) political games. In terms of human resources, several factors are of concern in productivity levels such as education, skills, age, work time and location. Productivity is a term in production activity as a comparison between output (output) and input (input). The higher the success rate is high level of accuracy. The research method used is descriptive qualitative method, with primary data method using Purposiv Sampling method. The findings here are the relationship between the above factors and the level of productivity of the human resources involved in this case are the workers. With this meeting can be explained in determining the expected level of productivity.

Kata-kunci : work productivity, delays, project implementation

Temu Ilmiah Ikatan Peneliti Lingkungan Binaan Indonesia (IPLBI) 6.
C 043-052